Factors before install concrete batching plant

Factors before install concrete batching plant

Horizontal concrete batching plant? project is divided into concrete mixing plant and commercial concrete mixing stations, different types of mixing station, has a different layout. Engineering is usually small and medium sized mixing station equipment, merchandise and medium-sized manufacturers mix mixing station is mixing station equipment. The following describes the layout of the concrete mixing station when to pay attention to several aspects:

Henan Daswell Machinery is a professional manufacturer of mining machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:Small concrete batching equipment,double horizontal shaft concrete mixer,If you are interested in our products, please contact us freely: sales@daswell.com

(1) Industrial raw materials. commercial concrete batching plant works is to put each finished industrial raw materials for further processing Ready-mixed Concrete mixing/batching plant, the finished material is mainly gravel, sand and cement diesel mobile concrete mixer, according to the gravel: sand: cement = 20-30%: 50-60%: 10-20% ratio ratio. The main components of the concrete products is gravel and sand, so the layout of the mixing station, local station must be considered from the sand, gravel and other places near.

(2) The area of transport. Concrete plant to be close to highways, railways, waterways, so as to facilitate transport, and remote transportation costs concrete products. Concrete product throughput and volume was relatively large, aggregate into the plant is, the transportation factors, but also to consider a top priority.

(3) Safety and environmental protection. To facilitate the mixing station layout workers to use, safe operation. Also in line with the state environmental requirements, stirring standing because the production process will produce a lot of dust and noise batch plant, so try to avoid the downtown station.

(4)Consumption of finished concrete. Because the characteristics of the concrete can not be stored, so it should be watered as soon as possible. Such asconcrete batching plant abroad to pitch consumption centers generally not more than 30km, transport time must be controlled before the initial setting of concrete, and therefore the transport distance clearly identified.